Coming soon — USTPilot is in pre-launch. Federal 40 CFR Part 280 plus state requirements for 10 states, launching shortly.

Federal 40 CFR Part 280 + 10 states · Monthly subscription · 14-day free trial

Your UST compliance schedule, already built.

Enter your tanks once. USTPilot generates every federal 40 CFR Part 280 deadline — walkthroughs, equipment tests, operator training — plus the extra requirements your own state adds, and keeps timestamped, inspector-ready records as you complete them.

14-day trial · $39 per facility per month · No setup fee

No checklists to build. No deadlines to remember. No loose paper.

The federal rules are already in

Tell USTPilot what equipment each tank has — construction, piping, release detection, spill and overfill protection. It applies the 40 CFR Part 280 requirements that match and puts every recurring task on a dated schedule. You never read the CFR or build a checklist.

Records that hold up at inspection

Every inspection is captured item by item with pass/fail results, photos, and a signature — timestamped by the server at the moment of completion, then locked. A record you filled in last month can't be quietly edited into a record from yesterday.

The binder is one click

When an inspector asks for your records, export a PDF binder for any period: every completed inspection, every photo, every corrective action, organized by task with its regulatory citation. Hand it over and get back to work.

Federal 40 CFR Part 280, pre-loaded

30-day walkthroughs, annual equipment checks, 3-year spill and overfill tests, release-detection monitoring, cathodic protection, operator training — the federal baseline is in from day one.

State requirements included for California, Florida, Texas, New York, Indiana, Michigan, Illinois, Ohio, Alabama, and Tennessee. Facilities in other states get the federal baseline.

Full obligation list →

Set up in minutes, not weekends.

  1. 1

    Create your facility and enter each tank: construction, piping, release-detection method, spill and overfill equipment.

  2. 2

    USTPilot generates the federal compliance schedule for exactly that equipment, with the next due date on every task.

  3. 3

    Work the schedule: open a task, mark each checklist item pass or fail, attach photos, sign. The record is timestamped and locked.

  4. 4

    When the inspector visits, export the PDF binder for the period — every record, photo, and citation in one document.

One price. Every tank at the facility.

$39 per facility per month · 14-day free trial · Cancel any time

The next 30-day walkthrough is already on the calendar.

Set up your facility today and your full federal schedule is ready before the first deadline. 14-day free trial, then $39 per facility per month. Cancel any time.